[1]
Thornton, C.H. 1973. Quality Control in Design and Supervision Can Eliminate Lamellar Tearing. Engineering Journal. 10, 4 (Dec. 1973), 112–116. DOI:https://doi.org/10.62913/engj.v10i4.216.